Gram District Heating - DK

 

Solar heating plant by Gram was built in only 10 weeks. The plant will cover approx. 17% of heating consumption in Gram. The heating plant is connected to 1,095 households and approximately 3,500 inhabitants.

 

Facts:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

 

Net area (operative): 10,073 m²

Number of solar collectors: 802

Slope from horizontal: 38°

 

Calculated peak capacity: 7 MW

Calculated annual production: 4,857 MWh

Calculated production/m²: 482 kWh/m²

Expected share of production at power station: 17%